Current Projects
Adaptive Reuse Community Centres
What is the Adaptive Re-Use of Community Centres project?
There are currently three ice rink facilities in the municipality that are underutilized and the Township has reduced operation funding. Through past review, it has been recommended to and...
Rapid Road
Project Description
The project limits consist of Rapid Road from Gore line (CR-50) to Gratton Trail
The 8.5 km surfacing project scope of work consists of the following:
Brushing
Culvert replacement
Minor ditching
Installation...
Sutherland Road
Project Description
The project limits consist of Sutherland Road from Highway 17 to Snake River Line.
The 1.35 km rehabilitation project scope of work consists of the following:
Removal of double surface treatment...
Hila Road
Project Description
The project limits consist of Hila Road from Zion Line to Beachburg Road (CR-21).
The 2.35 km rehabilitation project scope of work consists of the following:
Removal of double surface treatment...
Kohlsmith Road
Project Description
The project limits consist of Kohlsmith Road from Kerr Line to Queens Line (CR-4).
The 2.8 km rehabilitation project scope of work consists of the following:
Removal of double surface treatment...
Beachburg Water Treatment Plant Renewal and Optimization
Project Description
The Beachburg Water Treatment Plant (WTP) is located at 31 Robertson Drive, Beachburg, Ontario. The WTP was built in 1955 and the most recent retrofit was completed in 1994 which included a building expansion, high and low...
Transportation Master Plan
Project Description
The Transportation Master Plan (TMP) will provide a 'roadmap' for transportation planning needs over a ten-year period to 2033 in order to optimize the performance of existing infrastructure, identify areas where...